The incinerator to be fully assembled wired and logic function tested in the factory, prior to […]
“PYROLYTIC” combustion, by controlling the gasification of waste The incinerator manufacturer must avoid the release of […]
The incinerator shall be provided with a range of interconnecting ductwork between the thermal reactor outlet […]
The incinerator shall be equipped with water injection nozzle connection. If the temperature in the primary […]
Waste Incinerator Door: Side/Front Opening Door VS. Top Opening Door Things Side Loading Door Top Loading […]
1) Policy – Waste disposal management shall be taken special note to prevent hospital infection. – Infections […]
30kgs per hour(average) medical waste incinerator, design dual combustion chambers(primary chamber and secondary chamber), smoke filter […]