hot medical waste disposing machine, Operation Condition: 8-16 hr/ day  Control: Built-in data recording Operating temperature: Incinerator  /Primary Combustion Chamber Primary Chamber: 900 – 1200 0C Type: horizontal/vertical Temperature:  1200- 1300 oC Residence time of gases : >2 seconds Ash Residue: <5% of original waste size Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash Flue gas treatment   system : Capable of treating the flow of flue  gas as the incinerator is operating at its maximum capacity Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc  Auxiliary device: Fuel cut-off device Waste  feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time                                                                                                                                       Chimney (Stack): Type: Vertical type […]
The Bangor Borough Authority won’t market the prior incinerator property. Not right now, at least. The […]
Veolia is looking to supply non-recyclable commercial and industrial waste for its Newhaven Incinerator from regions […]
Ability of destruction in weight: 60 Kg/h. It should be able to work less 10 hours/day […]
On Friday Attorney General Buddy Caldwell declared the State of Louisiana reached an arrangement with Texas […]
Heathrow Airport has announced plans to move an incinerator away from Stanwell and create a 15 […]
In assessing these options, the U.S. military held the assumption that the present dumpsite situated at […]
Metro Vancouver is taking more heat over its strategy to build another garbage incinerator, with a […]
Recent Posts