Just one Ebola patient treated in a U.S. hospital will generate eight 55-gallon barrels of medical […]
The Board of County Commissioners broke plans Thursday for a regional waste-to-energy incinerator, preferring to haul […]
hot medical waste disposing machine, Operation Condition: 8-16 hr/ day  Control: Built-in data recording Operating temperature: Incinerator  /Primary Combustion Chamber Primary Chamber: 900 – 1200 0C Type: horizontal/vertical Temperature:  1200- 1300 oC Residence time of gases : >2 seconds Ash Residue: <5% of original waste size Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash Flue gas treatment   system : Capable of treating the flow of flue  gas as the incinerator is operating at its maximum capacity Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc  Auxiliary device: Fuel cut-off device Waste  feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time                                                                                                                                       Chimney (Stack): Type: Vertical type […]
The Greater Vancouver Sewerage and Drainage District is suing Maxxam Analytics International Corp. and Covanta Burnaby […]
The Greater Vancouver Sewerage and Drainage District is suing Maxxam Analytics International Corp. and Covanta Burnaby […]
PESHAWAR: Based on information gathered by the Environmental Protection Agency (EPA), 15 to 20 tons of […]
Ability of destruction in weight: 60 Kg/h. It should be in a position to operate not […]
One of these,tnthe steel industry generated two? English number Is Significantly higher than normal amount of […]
ADJUMANI. For the past four months, support staff in the hospital have been dumping medical waste […]
Recent Posts
Waste Incinerator|www.oeoes.com