The following requirements are to be considered as an integral part of the technical […]
Equipped with main combustion  chamber and a second chamber  for reburning  designed to ensure  complete combustion  […]
Incinerators used will be limited to daylight hours of operation. This includes shutdown, cleaning and maintenance. […]
5-1- Chambre de post combustion est installée au dessus du foyer  de combustion , elle  est […]
It must be a 3 chambered burner The loads ability of 250 kg The realty for […]
Capacité destructive de 55 Kg/h jour de déchets hospitaliers  avec un p?.c. i jusqu’à 3.200 Kcal/Kg […]
Operational Capabilities   PROCESS MINIMUM 1 TON PER DAY OPERATED WITH LIMITED TRAINING REGULAR MAINTENANCE CAN […]
Incinerate: medical waste and general waste Capacity to burn waste: 400 — 500 kg/hr Fuel: Diesel […]
The manufacturer must provide a declaration that the pressure vessel is manufactured in accordance with relevant […]
Manual autoclave with vertical loading; gravity displacement type with possibility for Vacuum.   Capacity:      Up to […]
Recent Posts
Waste Incinerator|www.oeoes.com