Day: November 13, 2025

news from: http://www.chinadaily.com.cn/a/202002/01/WS5e347a86a310128217273ead.html  WHO declares outbreak constitutes international public health emergency China vowed on Friday to work with the international community to uphold regional and international health security, and reiterated it has the confidence and capability to win the battle against the novel coronavirus epidemic, which has claimed 213 lives throughout the country as of Thursday. […]
Double Combustion Chamber,Double Italy Burner,Smoke Filter Included,Burning Rate: 50-200kgs per hour optional,Primary Combustion Chamber: 1.57M3(1570Liters),Incinerator Mainbody steel: 8mm thickness,Paint for outside face: 800°C Rate,Chamber Material: High Alumina Fire Brick Wall, 1750℃ Rate,Idea for campsite average or below 600 people,Chimney: 10 Meters, Stainless steel… Items/Model TS150(PLC) Principle Waste Incineration Treatment Burn Rate Average 150 kg/hour *(50/100/200kgs/hour […]
Diesel Biogas Dual Chamber Incinerator, with diesel oil and Biogas burner    Incinerator Items/Model HICLOVER TS50   Burn Rate (Average) 50 kg/hour Feed Capacity(Average) 100kg/feeding Control Mode PLC Automatic Primary Combustion Chamber 560L Internal Dimensions 100x80x70cm Secondary Chamber 280L Smoke Filter Chamber Yes Dual chamber up to 50 kg per hour semi-automatic Independent control of primary and secondary temperatures via control panel 850 -1100 C 1000- 1200 C >= 2 seconds <5% Electronic control panel providing friendly interface for operators with minimal training Mobile: +86-138139 31455(WhatsApp) Website: oeoes.com/waste  Email:     [email protected]        Email:    […]
 There are 03 sets Model YD-100 delivery to Iraq between year 2013 to 2014. The incinerator use for local several construction sites and all fuel type is diesel oil.   Items/Model YD-100 Burning Rate (kgs/Hour) 100 kgs/Hr. Feed Capacity (kgs) 200 kgs Equipment Weight 5300 kgs Primary Chamber (Liters) 1200 Secondary Chamber (Liters) 500 External […]
1. For clinic,lab, small hospital with low waste output capacity, no condition with other medical waste treatment(Underdeveloped country or area, or emergency situations ). 2. Doctor, nurse treat the syringes, needle, infusion set immediately after use, plug to play, no dispersion risk. 3. melting the syringes needle with 1250Celsius high temperature to metal slag, sterilization […]
The Incinerator units shall be designed to last in operation in a tropical environment for a minimum period of 10 years if the specified maintenance schedule is followed. All metal surfaces (except combustion chamber internal fittings) shall be either galvanized, enameled, painted or otherwise treated against atmospheric and process induced corrosion,Medical waste management pdf. The […]