hazardous waste high temperature incinerators for the therapy of contaminateds materials. The waste will certainly be blended, including medical, oily wastes, woods as well as lab wastes. Key combustion
Diesel/LPG/LNG burning main combustion chamber/primary burning area
Additional combustion
Home time in the second chamber not much less than 2 seconds
Both primary and the second temperature levels preserved till all the waste has been completely combusted
Chimney
Smokeshaft with a minimal elevation of 4 meters above ground level
Minimum leave speed of the discharges not less than 10 metres/second
Temperature level Cautions
Distinct and/or noticeable alarm to caution the driver when the additional temperature level drops to below the required temperature
General
Control box that can be detached and placed on separate stand at least 1.5 meters from incinerator at around 1.6 meter height
Burner version A.
Burn Price 65kg/h minimum.
Weight (kg), please suggest:.
Second Chamber.
Gas Retention Time – – 2 Seconds. Fuel – Diesel/LPG/LNG, please suggest. Power Supply for – Control Box – 220V-240V 50Hz single phase. Minimum operating temperature 850 ° C, please suggest. One year Spare Components Bundle for complete maintainability. 10m Tube Pipeline, suggest length.
I000 Litre Gas Tank + Pipe System, indicate volume.
Added chimney extension, indicate elevation.
Warranty, suggest no of years
Burner design B.
Burn Price 150kg/h minimum.
Weight (kg), please show:.
Second Chamber.
Gas Retention Time – – 2 Seconds. Diesel/LPG/LNG, please indicate. Power Supply for Control Box- 220V-240V 50Hz solitary phase.
Minimum operating temperature 920 ° C, please suggest.
One year Spare Parts Package for full maintainability.
10m Pipe Pipe, show size.
I000 Litre Gas Container + Pipe System, show quantity.
Additional smokeshaft expansion, indicate elevation.
Warranty, show no of years
Burner version C.
Burn Price 250kg/h minimum.
Weight (kg) please indicate:.
Second Chamber.
Gas Retention Time 2 Seconds.
Fuel Diesel/LPG/LNG, please show.
Power Supply for Control Box 220V-240V 50Hz single phase.
Minimum running temperature 920 ° C, please show.
One year Spare Parts Package for total maintainability.
10m Tube Pipeline, suggest length.
I000 Litre Gas Tank + Pipeline System, show quantity.
Added chimney expansion, show height.
Service warranty, indicate no of years
Whole lot 4– High Temperature Waste Incinerator.
HTW Incinerator design D.
Burn Price – – 150kg/hour minimum.
Weight (kg), please indicate:.
Secondary Chamber.
Gas Retention Time 2 Seconds.
Gas Diesel/LPG/LNG, please indicate.
Power Supply for Control Box 220V-240V, single phase 50-60Hz.
Minimum operating temperature 1200 ° C, please indicate.
One year Spare Components Package for total maintainability.
10m Hose Pipe, indicate length.
1000 Litre Gas Tank + Pipeline System, indicate volume.
Additional chimney expansion, indicate elevation.
Warranty, show no of years
Whole lot 5– Mobile Burner.
Mobile Incinerator model E.
Burn Rate 50kg/h minimum.
Weight (kg), please indicate:.
Additional Chamber.
Gas Retention Time – – 2 Seconds. Gas – Diesel/LPG/LNG, please indicate. Power Supply for – Control Box – 220V-240V 50Hz solitary phase. Minimum running temperature 850 ° C, please indicate. One year Spare Components Bundle for complete maintainability. 10m Hose pipe Pipe, show length.
1000 Litre Gas Storage Tank + Pipe System, show volume.
Added chimney expansion, indicate height.
Guarantee, indicate no of years
Lot 6– Mobile Incinerator.
Mobile Burner model F.
Burn Rate 100kg/h minimum.
Weight (kg), please suggest:.
Additional Chamber.
Gas Retention Time – – 2 Seconds. Fuel – Diesel/LPG/LNG, please indicate. Power Supply for – Control Box – 220V-240V 50Hz single stage. Minimum operating temperature 850 ° C, please suggest. One year Spare Components Bundle for full maintainability.
10m Tube Pipe, suggest length.
1000 Litre Fuel Tank + Pipeline System, indicate quantity.
Additional chimney expansion, suggest elevation.
Guarantee, show no of years
Great deal 7– High Temperature Waste Mobile Incinerator.
HTW Mobile Incinerator design G.
Burn Rate 100kg/h minimum.
Weight (kg), please indicate:.
Second Chamber.
Gas Retention Time – – 2 Seconds. Gas – Diesel/LPG/LNG, please indicate.
Power Supply for Control Box – – 220V-240V 50Hz single phase.
Minimum operating temperature 1200 ° C, please show.
One year Spare Parts Plan for complete maintainability.
10m Hose Pipe, indicate size.
1000 Litre Gas Storage Tank + Pipeline System, show quantity.
Additional chimney extension, suggest elevation
Comments are closed