Demands and specs for the process of supply, installation, operation and make sure the three incinerators for burning and incineration of medications and also harmful compounds for customizeds branch

Free 3 years warranty for incinerators from shipment day. In addition of complimentary added components ensure letter needs to be valid for 10 years from the end date of assurance.
– The primary component of the body of the heating system is stainless steel box, the thickness of not much less than 7 mm with a coating of zinc phosphate layered with aluminum reflector to heat.
– a heating system Have to have two spaces, one of them is the most important space of not much less than the “5” ranges into the process of burning materials and various other secondary area of not much less “two ” ovens to shed resulting gas from the first procedure as well as the smokeshaft.
1-Technical explanation consists of technological specifications, scope of job, the needs of the process and also upkeep.
– Mounting a readymade concrete base (Precast) with Elevation 30 cm in the air and also 20 centimeters recorded below the surface region of the planet.
Timer for Extinguish the cooker instantly depending upon the moment called for.
– The approach of feeding the furnace using a side slot or from the leading and also the exhaust of the smoke is completely stopped.
Provided time asap
1. Educating for professionals and also drivers for a time not much less than two days at each site and give trainees training certifications.
– All devices should be very immune to exterior conditions such as high temperature (50oc).
– The rest of the accessories in all the tendencies even allows the employee directly feeding as well as maintenance job, cleansing and relocate handily thinking about the propensities of the base to the door for water drainage of water.
– Electrical capacity called for “220/ 380-volt “60 hertz.
Indicators for furnaces as well as index overload.
Supplies operating as well as emergency situation maintenance also provides totally free spare parts for 3 in the beginning day of the job. The firm should make routine upkeep every 3 months as well as increase the upkeep report to the administration of public issue and also Maintenance.
– Heaters must be devastating adequate to burn and blaze the material which stated formerly.
Send your manuals for installation systems.
2- Letter from the provider to give three years warranty for incinerators from delivery day. Along with free spare parts ensure letter should be valid for one decade from the end day of guarantee.
– a heating system has the capacity to hold up against severe temperatures as much as “130o c As well as also, it assures constant procedure of which can be used for 1 day with the capacity to eliminate residues throughout the work of the cooker, Protecting coating of calcium need to be present in the chambers with Density not much less than 50 mm as well as a wall depth of 100 mm.
– Burners need to possess the capacity of self-cooling after conclusion of the daily operating period.
– Isolation of shedding region: the area in between the walls must be of the “stainless-steel”. Furthermore, shed space has to complete of Thermal insulation product.
– the thickness of the door of 150 mm as well as a hardness of less than 170 kg/ m 3 to be scorched, automatic detailed remote system.
4-copmany should dedicated shipment, process, and also setup within 60 days from the date of site tasks detection.
Electric capacity need to be 380-220 v 60 Hz for all devices
Incinerators need to have smokeshaft not much less than “4 meters” height in the surface of the oven, also, it should be thermally protected and also non-rust capable, as well as need to similarly be removable, installment as well as tide default.
3- Brochures of cooker with all the called for specs

The offer cost must include the following;-.
3- Provide certification that the incinerators are environmentally friendly and also attach evidence that environmental management companies in the nation of Origin and also your product should be discharges cost-free as a consequence of the level of sensitivity of its worldwide air ports.
Company billing (certified from Chamber of Business).
– The heating systems are extremely efficient, emissions-free, secure, and environmentally friendly as well as have capacity of less than 3,000 kg of substances as well as the purchase price of melting at least 400 kg/ h.
– Guarantee that the combustion of substances released in the secondary room must be at least two seconds duration as well as the distance is lined with high-density ceramic fibbers.
Waiting for your excellent reply.
Files have to include all the information such as pamphlets, technical resources, operating, maintenance guidebooks, as well as pamphlets addressing the key-board.