The Professional will supply a Cremation System bundle for TWO (02) Cremators and system authorized by related authority, which need to suit the alloted area as shown on the strategy drawings. The work will include however not limited to make prep work, authority design authorization, supply, fabricate, construct, appointing, testing, functional approval, provide training as well as additionally service warranty of the system package. The job will include all preliminaries, related civil and also structural work, mechanical and also electrical job as well as all outside job needed for the proper completion as well as operational of the system and as adheres to: The incinerator will certainly be used for a team of personal multi profile medical facilities.

The hourly-generated waste has to do with 100kg per hour, however with 1000kg daily amount.

As a result of the financial circumstance in Bulgaria currently, our researches shows that a 100kg/hour system can fit the needs set in the job.

Please, offer us an Incinerator system that can match the parameters defined above. We prepare to offer details that is more comprehensive if you need such one. Within the technical requirements of you item we need to have complete details of the specifications of exhaust gases, with all certifications you have regarding the environmental security regarding EU directives.

1. All preliminaries which will consist of but not limited to offering job insurance coverages, taxes, mobilisation and demobilisation, agreement administration and guidance, layout and also expert charge, authority style approval, functional approval, website prep work, momentary storage, health and wellness environmental safety and security and security, setting out, CIDB levy, duties, deposits, fees, fees, payment yet not leaving out just the bank guarantee to the authority JPP which shall be offered by the Client, development coverage and also other called for preliminaries for successful conclusion of the work.This sort of burner is what you have actually described as a ‘‘ reduced temperature thermal disintegration incinerator’. We can speed up the burning procedure by using warm air from a downstream process which can be fed back right into the incinerator to elevate the burning temperature.
substantially. These kinds of incinerators are the type that would most likely have been made and also utilized years ago prior to the anti pollution guidelines were generated. Our team believe that they would certainly be very easy as well as low-cost to produce for a company such as your own, as long as a big sales volume can be acquired. Our company believe that our innovation will certainly develop a large requirement for this type of incinerator as well as would also make a great organization opportunity for a firm, such as Clover, that is able as well as willing to manufacture and also provide them. I make sure that this easy sort of burner could be conveniently customized to enable automated billing and probably likewise automated cleansing?

2. All architectural, building as well as architectural work that includes yet not limited to building and construction of all enhanced concrete job, smokeshaft, structural steel job as well as all building work for all needed demands, operational and control panel system for correct conclusion as well as successful procedure of the syste. The Service provider has to make great all the jobs being disturbed.We desire a very basic, solitary combustion chamber, burner which can burning all sorts of waste as well as rubbish items. We will certainly be dealing with the discharges from the burner in another procedure so we do not need to have scrubbing up or other cleansing devices to prevent pollution.
The burner is needed to operate 24/7 constantly so it requires to be able to be cleaned whilst still running. The waste materials being shed will have non flammable products and these will need to be cleaned out of the burner. We would certainly like this cleansing to be as basic as feasible. The same applies to the loading of rubbish right into the burner, which we would love to have the ability to be done automatically if possible.

3. All mechanical and also eletrical jobs which includes yet restricted to supply, deliver as well as installation of all valves, penstock, screens, pumps, float swithces, adaptable adapter, stress pipeline functions, blower, hot dipped galvanised lifting davits, air diffusers, hot dipped galvanised handrailings, warm dipped galvanized gratings, button boards, cabling and also wirings, illumination, earthing, metering, lighting protection, flow measurement as well as circulation recorders, testing & & comissioning and all essential for correct conclusion and effective operational of the system

OVERALL REACHED COLLECTION

Layout as well as Develop approved gas cremation system.
( Cont would certainly)

4. The Service provider shall offer as well as totally comply with all needs by the associated authority during design phase, layout authorization, assessment as well as after evaluation, handing over of the system package whether it is plainly shown or otherwise yet considered needed for effective conclusion as well as contentment to the authority. The Contractor must admit his tender cost all direct and indirect price at no additional price to the Client for all such conformities.7. Kind of waste: Bio-medical/ Harmful/ Community/ Garbage = ALL and Mixed
8. Any various other: Rubber, rubber tyres, Batteries, green waste, paper and cardboard
9. Amount of waste produced each day in kg: 3 -5 tonnes daily
10. Period– incinerator will be used per day: 1– 8 hours/ 1– 16 hrs/ Constant
11. Approximate moisture content: Variable
12. Regional incinerator operating and also discharge criteria: India/ EURO/ US-EPA Australia
13. What is the height of the smokeshaft required?: No chimney is called for. Flue length need to be approximately 2 to 3 metres to join to a downstream process
14. Gas recommended to be made use of: LDO/ HSD/ FO/ SKO/ Gas/ Other – – No fuel called for – Meant to cost-free melt waste products
15. Accessibility of power as well as kind: Electrical energy if called for
16. Details of space available: Not restricted
17. Do you require an automatic loading system?: [X] Yes [] No.
18. Do you call for a gas scrubbing system?: [] Yes [X] No.
19. Just how quickly do you require the system to be supplied?: Sea Freight to Port of Cairns, Queensland, Australia in approximately Two months.
20. City as well as country of use: Australia.
21. Whether the area is a coastal area: [] Yes [X] No.
22. Any kind of other details requirements: Primary burning chamber just is required. Solid and also ignitable waste products require to be with the ability of being recovered from the incinerator quickly utilizing an automated treatment. This is because the incinerator will certainly be called for to operate 24/7. Rotating kiln or moving floor may be thought about if considered sensible by the distributor. One initial incinerator is needed for a proof of idea task and also future orders for the effective vendor, following effective implementation of this project, are likely to be considerable.
23. It would be most valuable if the supplier might send out a video of the incinerator in operation or layouts as well as photos to show how it works.

5. The Professional will be in charge of all upkeep of the system, regular and also periodical maintenance such as cleaning up etc. during, upon completion, prior to and also after examination. The maintenance will be in fully conformity to the authority needs as well as fulfillment and also shall be deemed included in the Specialist tender cost as well as at no additional cost to the Client.

6. The Contractor should send to the S.O their suggested system plan detail, that includes authority authorization and an A4 or A3 preliminary dimensioned system layout fitting into location allocated in the plan drawing.

7. For upkeep and solutions during Problem Liability Duration, react period to any kind of complaint for the Contractor to participate in shall be within 24hours

8. The Cremators plan shall, inter alia, inclusive the complying with scope:

– – Heating System Chamber and also Afterburner

– – Burning System

– – Control Board

– – Solitary refactory lined chimney for 2 cremators

– – Flue Gas Tasting Platform

– – Electrical circuitry within the system needs

– – Raking Tools

– – Ashbox

– – Authorization from DOE/ Regional Authority

– – Any other scope/works required for the systems

Categories:

Comments are closed

Recent Posts