Solid waste incinerator, productivity 100kg/h placed in a container.  Dimensions: 2,45×12,2m and 2,9m in height.  
Operates natural gas with the pressure of 0.005 MPa and consumption of 0,21-0,23 m3 per kg of waste. Installed power C 55 kW. Total 3 units.
Fuel capacity:200l or more
Incinerator has a temperature monitoring system in place
Wet scrubber capable of removing sulpur dioxide in the fumes
Water capacity of 2000l or more
Incinerator temeprature above 950 degree celsius
Incinerator used a dual chamber system for incinerator
Capacity per hour at least 25kg
1. A combustion chamber :
a. watertight door for manual loading of waste.
b . A burner start is limited to inflammation of waste .
2. A camera post-combustion gases :
a. burner combustion , low power .
b . An injection device air for total recombustion of the gases .
c . An input device cooling air of the combustion gases.
d . A smoke evacuation duct .
 
3. A control panel ensuring complete combustion cycle .
 
The incinerator meets as indicated on waste incineration .
They will not burn plastics, packaging except that the amount so small that gases need not receive any treatment, secondary combustion chamber to 1100C handles everything ..
 
Water waste incinerator, productivity up to 3m3/h and placed in a modular building. Dimensions: 8,2×5,9m and 5m in height. 
Operates natural gas with the pressure of 0,016 MPa and consumption of 0,35m3 / kg of drainage. Installed power C 35 kW. Total 1 unit.

Categories:

Tags:

Comments are closed

Recent Posts