I. Measurement of the Incinerator 4,410 W x 3,037 L x 4,836 H mm

II. Energy

Utility problem for the incineration gadgets running is your sticking to.

1) Gas: Light oil or Kerosene

2) Electrical Power

Electric Motor

-0.1– – 110kW: Air Conditioner 220V x 3PH x 50Hz

– – – – Below 0.1 kW: Air Conditioner 220V x 1PH x 50Hz Control Circuit

– – – – MCC controller: A/C 220V x 1PH x 50Hz

– – – – Tool: Air Conditioner 220V x 1PH x 50Hz

– – – – Switch over Over Gear: Air Conditioning 220V x 1PH x 50Hz

2.

– – Switch Over Gear: Air Conditioning 220V x 1PH x 50Hz

2. Door -to-door transport, Setup, Commissioning and Training

3. Prices quotation

– – Cost requires to be given in Ethiopian Birr (incl. VAT)

– – Cost need to include Additional cost components such as products, insurance, installment and training for essential personnel, until approval obligation where suitable

Categories:

Comments are closed

Recent Posts