Pyrolytic:- Hot Medical Waste Disposing Machine |
|
Operation Condition |
8-16 Hr /day |
Controls |
Built in data recording |
Incinerator |
Type: continuous loading |
Capacity/Burn rate per hour: 250 -300kg/hr |
|
Temperature: 900-1200 oC |
|
Material: External- 3 layers Internal lining: a fire proof material of pre-fired refractory bricks with Aluminium lining, resistant to corrosive waste or gas and to thermal shock |
|
Secondary |
Type: horizontal/vertical |
Temperature: 1200-1400 oC |
|
Residence time of gases : >2 seconds |
|
|
Material External- Low thermal mass insulation 14-30 oC Internal lining: a fire proof material of pre-fired refractory bricks with Aluminium nettle lining, resistant to corrosive waste or gas and |
Ash Handling System |
Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash. |
Flue gas treatment system |
Capable of treating the flow of flue gas as the incinerator is operating at its maximum capacity |
Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc. |
|
Auxiliary device: Fuel cut off device |
|
Waste feeding mechanism |
Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800L at a time |
Chimney (Stack) |
|
height: 7-10 meters |
|
Material: Fireproof cast, stainless steel |
|
Wet scrubbing system |
Vertical sprat tower with baffles or packing inside |
Gas emission |
Reduction of Pollutant gas SO2, HCL, HF and line particulate |
OUTPUT |
ASH -Max <5% of original waste size |
GAS- SMOKELESS,ODORLESS |
|
Emission standard |
WHO/ European |
Test report for emission testing |
Must be provided |
Product Data sheet/ Catalogue |
Must be attached to the ITB |
Additional Requirement |
– Local agent or branch in Ethiopia – Training for users as well as for EPHI maintenance staff on preventive maintenance – Fuel tanker with a minimum capacity of 2500 litre (made of plastic material with overfill prevention valve ,fuel gauge, lifting eyes) – The bidder should be willing to sign at least a five years’ service and maintenance agreement with the client (EPHI) – The supplier shall arrange by itself lifting equipment and labour needed during the installation, testing and commissioning of the incinerator |
Comments are closed