CONTAINERIZED HEATER FOR INCINERATING HAZARDOUS AND ALSO NON HAZARDOUS WASTES

CONTAINERIZED BURNER FOR INCINERATING HAZARDOUS AND NON HAZARDOUS WASTES (BOTH DOMESTIC In Addition To INDUSTRIAL) AT A MINIMUM COST OF 300KG/HR WITH THE ABIDING BY DEMANDS: Ø PRIMARY CHAMBER VOLUME 7.2 M ³ Ø BURNING CAPABILITY 300Kgs/hr. Ø PRIMARY CHAMBER TEMPERATURE LEVEL 850 ⁰ C AND ALSO SECONDARY CHAMBER TEMPERATURE LEVEL 1100 ⁰ C Ø … Read more

STRONG WASTE BURNER

Primary chamber – Consists of a monolithic high grade refractory concrete with high grade insulation backing, . Utilising a refractory hearth or equivalent for continuous ash removal. Secondary Chamber – Consists of high density, low thermal mass refractory ceramic fibre with an innovative low emissivity protective coating. bio medical waste treatment plant ( Incineration )with … Read more

dual chamber burner

Waste calorific worth: 4000KCAL/KG Moisture Web content: 10-25%. Small Ability: 50Kg/Hour set load. Additional Chamber: 2 Secs @ 850degrees C The main burning chamber must make certain very little separation temperature degree is not much less than 850 degrees C. INSULATION. Calcium Silicate. Restricting Constant solution restriction 1000 degrees C. Density 25mm THROUGHPUT. 50kg/hour at … Read more

tiny range burner

It must have the capacity to run not less than 10 hours/day This burner must be able to wreck all flammable wastes produced by medical centers, personal facilities, study laboratories, institutes, and also so on. 400 and its elevation: 8 m The Quantity of the burning chamber a minimum of: 1.200 L The Measurement of … Read more

laboratory heater

the entire carcass of animals (cattle, steeds, Sheep, pigs, and more), along with normally contaminated materials Products in the gas stove. ? Opening Doors – – – – the closure as well as additionally dependency automatic system, Which are dealt with from another area by the operator. ? made to work in long mode in … Read more

medical incinerator producer

1. The double chamber incinerator shall ideally be made. Air supply in the primary and secondary chamber shall be controlled in between 30% -80% as well as 170% -120% of stoichiometric amount specifically. Circulation meter/suitable circulation measurement tool shall be supplied on the key and second air ducting. The combustion air shall be provided via … Read more