medical waste
Bid to burn waste from out of town in Newhaven Incinerator
Veolia is seeking to source non-recyclable commercial and industrial waste for its Newhaven Incinerator from areas neighbouring East Sussex and Brighton and Hove. It argues this will allow the incinerator to produce enough energy to power 25,000 homes continuously. But cllr Rod Main from Newhaven said this would lead to more trucks and pollution. Veolia … Read more
Incinerator with Capacity of destruction in weight: 60 Kg/h.
Capacity of destruction in weight: 60 Kg/h. It should be able to operate not less than 10 hours/day This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc… Design Specification : Types A, B, C, D, and E of medical waste “PYROLYTIC” combustion, by controlling the gasification of … Read more
Texas Ebola waste will not be disposed in Louisiana
On Friday Attorney General Buddy Caldwell announced the State of Louisiana reached an agreement with Texas incinerator Veolia Environmental Services and Louisiana hazardous waste landfill Chemical Waste Management to ensure that incinerator ash associated with the recent Dallas Ebola virus occurrence will not be transported or disposed of in Louisiana, . On Oct. 13 the … Read more
Campaigners welcome Heathrow’s plans to move incinerator
Heathrow Airport has announced plans to move an incinerator away from Stanwell and create a 15 mile ‘green ring’ around the town. The airport said it altered its plans after residents raised concerns over its plans to relocate its incinerator to the Bedfont Road area. A Labour county councillor however has said it is like … Read more
Supply, Installation and Commissioning of DIESEL FIRED INCINERATORS
Supply, Installation and Commissioning of DIESEL FIRED INCINERATORSMedical Waste Incinerator, 100 to 120 Kg/hrApplication For incineration, general and pathologicalCapacity 100 C 120 kg/h burn rateType Two combustion chambers type; primary and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unitOperating time Minimum 8 hours dailyOperating temperature From 850 0C to 1200 0C, Automatic controlledResidual Ash 5 to 10%Construction Constructed from heavy duty mild or aluminized steelOr equal and approved equivalent Insulation material Refractory material lining similar or equal to calcium Silicate and hot face combination of heavy duty brickworkInternal Construction Fixed hearth type complete with gratings, concave bottom and charging door, lined with refractory materialCharging Door Suitable for manual loading of wastes and with smooth Dear seal equivalent of Ceramic seals with hinges.Door Lock Automatic, Electric typeAsh removal door Provided, for removing resultant bottom ash leftovers from the Primary chamberGratings ProvidedLoading Manual loading of wastePrimary Burner Fully automatic, with fuel, temperature and speed controls with ignition system flame detector Air fan Complete with safety features, flame failure Diesel fired fuel injector type Flange mountedBlower Provided. 3 phase for supplying excess combustion air through the distribution system with speed control systemTemperature Minimum exit 850 0CObservation port To be provided with protective glass type 3.3 Secondary chamber
Tinian solid waste: Where to go?
THREE options are on the table for disposing off Tinian solid waste: incineration, Fukuoka method or off-island disposal. The Marine Forces Pacific recently held an ad hoc committee meeting with the Bureau of Environmental and Coastal Quality, Environmental Protection Agency, Tinian Mayor’s Office, Department of Public Works and Administration representatives at the BECQ office on … Read more
New Metro incinerator would cost $1.3 billion more than planned: study
Metro Vancouver is taking more heat over its plan to build a second garbage incinerator, with a new study commissioned by waste company Belkorp Environmental Services suggesting the move could cost up to $1.3 billion more than originally estimated. The analysis, conducted by ICF International on behalf of Belkorp, comes as Metro Vancouver attempts to … Read more
INCINERATOR SPECIFICATION Capacity UPTO 20 kg/hr
Size: 940 x860x2700 mmMaterial: STAINLESS STEEL STACK, REFRACTORY CONCRETE LINING SPECIAL INSULATION MATERIALWith burner: 15 C 20 KWTemperature: PRIMARY CHAMBER = 800°C AND SECONDARY CHAMBER = 850 – 1200° CSufficient heat generation for secure and complete combustion 600-800 °C in the first chamber and >1000 °C in the second chamberEasy transportation on standard EURO-pallets Constructed in a modular fashion easy on-site movement and assembly with a minimum of equipment and technical skills;For the destruction of problematic waste like sharps, amputates and body parts, wet or moist matter; Off-gas quality: moderate smoke emissions during one quarter of the total incineration time; no visible emission during three quarters. AS PER INTERNATIONAL STANDARDS The remaining ash approximately 5-10% in weight and below 1% in volume of the original waste AS PER INTERNATIONAL STANDARDS Chimney height at least 5 m above the incinerator 5m ABOVE FROM THE GROUNDTemperature resistance of the lining at least 1,200 °C