Solid Waste Incineration Big Scale

Basic Info. Model NO.:solid waste incinerator suppliers for the lab Export Markets:Global Product Description Nanjing Clover Medical Technology Co., Ltd.. Key Features:  * All models with Dual combustion chamber.  * Stainless Steel chimney/stack, long lifetime. *according to order  * High temperature, long lifetime of incinerator.  * Free or minimal installation onsite.  * High speed, from … Read more

Animal Incinerator

Basic Info. Pullution Sources:Solid Waste Processing Processing Methods:Combustion Export Markets:Global Additional Info. Trademark:clover Product Description Key Features:  * All models with Dual combustion room.  * Stainless Steel chimney/stack, long lifetime. *based on sequence * High fever, long lifetime of incinerator.  * Free or minimal installation on site.  * High speed, from 10kgs to 500kgs per … Read more

Pets Crematorium

Basic Info. Style:Crematorium Material:Crematorium Species:Dog Export Markets:Global Additional Info. Trademark:CLOVER Origin:Nanjing Clover Product Description The required circular Medical Waste Incinerator is going to be quoted according to Technical Specifications provided below:  1) A self-contained, gas gas, medical waste incinerator with a minimum burn speed capacity of 100 kg/day.  2) A medical waste incinerator shall be … Read more

Medical Waste Incinerator Diesel and Gas Specification

Basic Info. Model NO.:medical solid waste incinerator 100kg Export Markets:Global Product Description Key Features:  * All versions with Dual combustion room.  * Stainless Steel chimney/stack, long life. *according to sequence * High fever, long life of incinerator.  * Free or minimum installation on site.  * High burn rate, from 10kgs to 500kgs per hour, up … Read more

hiclover 10kgs per hour incinerator

Smallest waste incinerator for small hospital  average 10kgs per hour.  with double(2) sets burner. Equipment Technical Specifications Model YD-10 Feed Capacity Typical 20 kgs per feed Burning Rate Typical 10 kgs Each hour Burning Time Each Feed 2 hours Voltage 220V Fuel Diesel Petroleum Burner Italy Burner Feed Mode Manual Fuel consumption (Oil) 5.4-12.6 Kgs/Hour … Read more

Incinerator Operating period Anticipated daily period 8 hours

Operating period Anticipated daily period 8 hours Maximum operating period 12hours Chamber Should be refractory lined to the following standards, hearth and lower section of chamber walls. Hot face materials Super dusty firebricks Limiting continuous service limit 1500°c Thickness 100mm Thermal conductivity 1.3W/mk Insulation Calcium silicate Limiting continuous service limit 1000°c Thickness 25mm Thermal conductivity 0.095w/mk Chimney/stack Should be manufactured from refractory lined mild steel or high quality air cooled stainless steel. The chimney/stack should have a minimum height of 10 meters above ground level Ignition burners Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves, fan and motor Maximum rating :               at least 450kw/hour Burner:                                  arranged for on/off operation Maximum consumption :   at least 6litres per hour Average consumption :      at least 3litres/hour After burner Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves fan and motor. Maximum rating :     At least 450kw/hour Burner:                        arranged for on/off operation Maximum consumption:     at least 9 litres/hour Average consumption:         at least 4.5 litres /hour Flue gas treatment Should have particulate remover (scrubbers) Electrical supply Single phase 220/240v a.c,50/60hz Documentation Operation manual   2 sets Service /maintenance manual 2 sets

Incinerator Operating period Anticipated daily period 8 hours

Operating period Anticipated daily period 8 hours Maximum operating period 12hours Chamber Should be refractory lined to the following standards, hearth and lower section of chamber walls. Hot face materials Super dusty firebricks Limiting continuous service limit 1500°c Thickness 100mm Thermal conductivity 1.3W/mk Insulation Calcium silicate Limiting continuous service limit 1000°c Thickness 25mm Thermal conductivity 0.095w/mk Chimney/stack Should be manufactured from refractory lined mild steel or high quality air cooled stainless steel. The chimney/stack should have a minimum height of 10 meters above ground level Ignition burners Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves, fan and motor Maximum rating :               at least 450kw/hour Burner:                                  arranged for on/off operation Maximum consumption :   at least 6litres per hour Average consumption :      at least 3litres/hour After burner Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves fan and motor. Maximum rating :     At least 450kw/hour Burner:                        arranged for on/off operation Maximum consumption:     at least 9 litres/hour Average consumption:         at least 4.5 litres /hour Flue gas treatment Should have particulate remover (scrubbers) Electrical supply Single phase 220/240v a.c,50/60hz Documentation Operation manual   2 sets Service /maintenance manual 2 sets

Refractory constructions incinerator

* Burning Rate                                                     (50-120kg/hour) * Minimum Operating Temperature                (850°ϲ(Primary combustion) * Maximum Operating Temperature               (1450°ϲ(Afterburner chamber) * Secondary Burning Capacity                         (Compulsory) * Density Insulation                                           (20mm high) * Refractory Casting                                          (Minimum 65mm) * Heavy duty refracting lining to withstand    (1500°ϲ) * Average burn out time: Maximum                (3.0 hours) * Fuel Type                                                          (Diesel) * Fuel Consumption in L/hr:                            (7.5 to 9) * Residence time in secondary chamber     (2 sec.) * Residue ash post 100kg                               (Max. 3.8kg) * Installation period                                            (Maximum 7days) Type : Refractory constructions Steel Structure 400+ Silica board + Fire Brick and Castable between Size : Outside – W 740 x L 1112 x H 790 / Inside – W 400 x L 800 x H 560 (mm) Fire load of Combustion volume : 0.18 m3 Fire table area : 0.32 m2 Material : SS400 x 6.0T, Silica Board, Fire Brick (SK-36), Castable (HACT-160) Temperature : 700 ~ 900 ℃ Residual gas combustion in secondary chambers : ≥ 2sec Input door size : W 200 x H 200 (mm) Ash door size : W 300 x H 400 (mm) Type : Refractory constructions Steel Structure 400+ Silica board + Fire Brick and Castable between Size : Outside – W 740 x L 1112 x H 745 / Inside – W 400 x L 800 x H 600 (mm)   Fire load of Combustion volume : 0.19 m3   Fire table area : 0.32 m2 Material :  SS400 x 6.0T, Silica Board 50T, Fire Brick (SK-36), Castable (HACT-160) Temperature : 1000 ~ 1100 ℃ WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters Nanjing Clover Medical Technology Co.,Ltd. Tel:  +86-25-8461 0201    Mobile: +86-13813931455(whatsapp/wechat) Website: www.hiclover.com   Email: [email protected] Email: [email protected]   Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC) Burn Rate (Average) 10 kg/hour … Read more

50-100-150-200 Kgs per Hour Solid Waste Incinerator Model TS150 PLC 1570Liters Chamber

Waste Incinerator Model TS150 PLC, Overview This model is small-scale waste incineration equipment for small waste output.  Construction is dual/double combustion chamber with 02 sets oil burner, batch load  incineration equipment. Waste feed chamber is 1570Liters (1.57m3, TS150 PLC).  Primary & Secondary combustion chambers and smoke filter chamber.  Batch load on the bottom of chamber. … Read more