
|
Model
|
YD-150
|
|
Burning Rate
|
Average 150 kgs/hour
|
|
Feed Capacity
|
Average 300 kgs/feeding
|
|
Primary Combustion Chamber
|
1500 Liters
|
|
Secondary Combustion Chamber
|
500 Liters
|
|
Mix Combustion Chamber
|
Yes
|
|
Smoke Filter Chamber
|
Yes
|
|
Feed Mode
|
Manual
|
|
Voltage
|
220V/380V
|
|
Power
|
1.03Kw
|
|
Fuel Type
|
Diesel Oil/ Natural Gas/LPG
|
|
Burner
|
Italy Original
|
|
Oil Consumption (Diesel Oil)
|
17–36 kg/hour
|
|
Gas Consumption (Natural Gas)
|
11–36.7 m3/hour
|
|
Internal Dimensions
|
150 x 100 x 96cm (primary chamber)
|
|
External Dimensions
|
240 x 170 x 380cm (without chimney)
|
|
Temperature Monitor
|
Yes
|
|
Oil Tank Capacity(if oil fuel)
|
300 Liters
|
|
Door Opening
|
59 x 81cm
|
|
Chimney Length
|
10.0 Meters
|
|
Chimney Type
|
Stainless Steel
|
|
Equipment Gross Weight
|
7500 kgs
|
before start the 2nd burner, full close all air valve on the 1st chamber. other operation keep same.
reason: at the first 10-20 min burnning the plactic waste, deflagration combustion in the chamber.
after 10-20 min, gradually increase air injection by air valve on the 1st chamber.
meanwhile, proposal 20-30 min burnning of the 1st chamber, stop the 1st burner(stop fire only, the fan inside the burner
still working), let the plastic burn itself(Spontaneous combustion) to save diesel oil.
a small waste to energy project to turn municipal solid waste
|
Model
|
YD-150
|
|
Main Product List
|
Primary Combustion Chamber
|
|
|
Secondary Combustion Chamber
|
|
|
Mix-Combustion Chamber
|
|
|
Smoke Filter Chamber(Dry Scrubber)
|
|
|
Incinerator Control Case(PLC Auto.Type)
|
|
|
Chimney:10.0Meters
*(upgrade to Stainless Steel, free cost)
|
|
|
Italy oil/gas burner: 02 sets
|
|
|
Oil Tank (if oil fuel): 300Liters
|
|
|
Optional Part:
Stainless Steel Wet scrubber(Cooling Spray tower)

|
into electricity. The project is to cater for a local council with a population of around 60,000 people and will serve as a
pilot project. If project is successful than other such plants will be installed in other towns and villages. The villages
will all cater for the MSW in their locality instead of a central large incineration plant to cate for the whole county.for a 7 ton per
hour plant on turn-key basis with your best price and delivery including full technical specifications, literature, drawings
and best export price.
Provided you can offer a good solution there is a chance of selling many more such plants for the local councils of the same
country, so this is an excellent chance for you to join forces with our company for market penetration with your products in
Europe.
1. TS100 model with dry scrubber system
2. YD150 with a wet scrubber system
HICLOVER Solution for Fighting COVID-19, Medical Waste Incinerator
Tel: +86-25-8461 0201
Nanjing Clover Medical Technology Co.,Ltd.