Heat Waste Incinerator Design D. MEGABYTES 750XL Melt Rate-150Kg/ hr minimum Weight( Kg) -4000 kg Additional Chamber
(dual chamber with post-burning) Gas Retention Time 2 2nd Gas Diesel Power Supply for control box 220V-240, single
phase 50-60Hz Minimum operating temperature level 1200 oC One year spare parts bundle for complete maintainability 10m pipe
pipeline. 1100 litre fuel Storage tank +pipeline system Containerised (the container will certainly act as housing) Added chimney expansion
1 metre high One (1) year guarantee.
Burner of 20 Kg: 03 Devices
Electrically controlled burner.
Two-compartment burner with an ability of 20 kg/ hour.
Incinerator with reduced upkeep and operating costs; Geared up with an automatic control panel as well as very easy to make use of with
electro-magnetic locking of the door.
A main waste decrease chamber of 900 ° C. A blog post second burning chamber of gases created in the main chamber
at the very least 1100 ° C.
Carbon residues in ash much less than 5% by weight in accordance with European Directive 2000/76/ EC.
With refractory cellular lining in products of higher quality
1/ Cost of a 200kgs/Hr medical waste burner.
2/ (CIF Term) Price of delivery from manufacturing facility to PAPUA NEW GUINEA port of LAE, Morobe province
3/ Price of 2 Clover engineers to Supervise, Installation, Training our engineers and appointing the medical; waste
Comments are closed