We are in the process of building a new hospital waste treatment plant and we are evaluating different technologies from around the world. We are looking to incinerate approx. 1 to 2 tons of biomedical waste per day using LPG for heating. Please send me all general information and quotes for machines of all ranges that could meet our needs. Also, please include emissions reports of all of the various machines that could be of interest to us especially with regards to dioxins and furals as well as lists of recommendations from past clients. If you have any government entities using your machines please include lists of whom they are as well as any documentation that you contain that can prove their use. Timing is also very important to us with regards of when the machines can arrive to Peru and be up and running. Therefore, it would be appreciated if you could include time frames and the whole process from purchase to installation and maintenance. Burning Rate:5–120kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash pot 100kg:Max 3.8kg
Product Description Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. […]
2019-05-20 Kết quả và Trường hợp336 lượt xem Nhà sản xuất rơ le chuyên nghiệp-Tianrui Precision […]
Medical Waste Incinerator, 50 to 60 Kg/hr Support Health Sector Support Project Point of Installation (Hospitals) Moi Voi, Makindu, Maragua, Eldama Ravine and Isiolo District Hospitals 1. General Description Supply, delivery, installation and commissioning of a medical waste incinerator suitable for disposal of Medical, General and Pathological waste in a safe and clean environment. The unit shall consist of two chambers and operate on the principal of controlled air and temperature. The unit shall consist a particulate remover (scrubbers) as stipulated in waste management regulations, 2006 (Legal notice NO. 121 of 29th September, 2006). The Unit shall be fully automatic and controlled by an automatic electronic controlled system except loading system which shall be manual. The unit shall be capable of incinerating between 50 to 60 kg of solid medical waste per hour. It shall be constructed from mild or aluminized steel lined with refractory material. Main unit Application For incineration, general and pathological Capacity 50 C 60 kg/h burn rate Type Two combustion chambers type; primary and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit Operating time Minimum 8 hours daily […]
NB.; Civil tasks in addition to any kind of various other pertinent options for the installation […]
Capacity Not less than 500Kg/hr.Operation 24hr-7days/week continuous operation.Combustion chamber 2 combustion chamber.Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C.Combustion Efficiency 99.99%Retention time Of the flow gases not less than 2 Sec in the hot portion.Excess Oxygen concentration Of primary combustion chamber 3-6% max. Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the same time prevent the Temp. of the outside body of the chamber not higher than 70 C.Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and the doors should be kept under negative pressure during the operation.Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA.Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled circuit many times before treating/ discharging into the sewage system in compliance with KEPARS.Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system including sensors.Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any flow disturbancies.Sampling point […]
Informations de base. Type: Incinérateur Marchés d’exportation: mondiaux Description du produit Principales caractéristiques: * Tous les […]
2019Y05M22D 行業動態 199 views 在許多車間內,為保證車間的潔凈度,所以一些車間會在車間的門口附近安裝一個空氣浴塵室或風淋室,以此來保證每個進入到車間內的工人,都不會帶着灰塵進入的。可是在操作空氣浴塵室的過程中,又需要注意什麼問題?下面將跟大家做一下介紹: 進入口的門是不能同時來打開的,如有空氣給吹出來,還沒停止的時候,預防把浴塵室側邊的門給打開。當進入到浴塵室的時候,一定需要依照空氣浴塵室的最大容納人規定來進入的,出來的時候,會限制不能超過10個人的。 在空氣浴塵室當中,需要依據所規定的位置來站立的,而空氣沐浴的時候,還需要來轉動自己的身體、拍打身上的無沉服,才便於灰塵更好的被吹凈。雙腳是需要多次來踩踏腳踏黏墊的,對清除鞋底的灰塵、異物也都是非常有利的。每個工人在進入車間來工作的時候,都需要在空氣浴塵室中來清潔身上的灰塵,免得把外界的灰塵帶入到車間中,污染到車間內的環境,不利於在車間內,更好來工作。 工人在進入車間之前,這無塵服是不能夠接觸牆壁、地板等一些地方的。更不可以來觸動出風口的,在安裝時,是需要定期來做出確認,並且還需要來記錄出風口的位置是不是正確的。而迴風口的過濾網,最好的更換頻率要控制在1季/次。一旦有破損或臟污的時候,是需要馬上來更換掉的。同時,更換的時候,還需要通知廠務來處理,也要記錄浴塵室的點檢表當中。 看來,在操作空氣浴塵室時,這個操作過程也確實有不少地方是需要注意的,如沒有很好來注意的話,那就有可能會在使用過程中,出現一些問題的。對浴塵室的正 確使用,會帶來很不利的影響的。 上一篇: 風管型自動捲簾式過濾器的安裝與維護 […]
وصف المنتج نانجينغ البرسيم التكنولوجيا الطبية المحدودة ، المحلية في مدينة نانجينغ ، الصين. CLOVER هي […]
2019-05-19 Pencapaian dan kes 241 pandangan LG Chem, LG Tongchuang Aliran udara yang bersih, kecekapan tinggi, […]